PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at the 1st floor Sally ports Facing West.jpg Continued installing black iron ductwork at the 4th Floor Facing South-East.jpg Continued installing curtain wall mullions at the Monumental Stair Facing South 1.jpg Continued installing curtain wall mullions at the Monumental Stair Facing South 2.jpg Installing copper piping at the 3rd floor Facing North.jpg
Next page Block work at the 1st floor Sally ports Facing West
Block work at the 1st floor Sally ports Facing West